天天干天天爽-精产国品一二三产区m553麻豆-亚洲色图18p-久久综合久-欧美色综合网-日韩一级黄色大片-中文在线字幕观看-人人超碰在线-橘梨纱在线-激情视频一区二区-国产小毛片-黄色顶级片-色一情一乱一伦-天天干夜夜爱-欧美日韩一区视频-日韩一级影片-在线a天堂-凹凸福利视频-亚洲gv猛男gv无码男同-色花av-亚洲aaa级-性色视频网站-操操操操操操操操操操操操操-69网站在线观看-精品一区二区成人免费视频-羞羞羞的视频-国产大片一区-印度性生活视频-日韩a∨精品日韩在线观看-国产精品视频六区

歡迎您來到翔宙熱能太康鍋爐廠家!
新聞資訊
低壓鍋爐操作規(guī)程介紹-河南太康鍋爐廠家
2023-07-12 18:24:56

1.工作前穿戴好所規(guī)定的勞動用品,并認真檢查鍋爐給,排水,供氣管道附件,閥、壓力表、水位計是否靈敏好使,確認后,方可進行工作 2.鍋爐水位標準高水位不超過三分之二,很低水位不低于三分之一,一般情況,保持在1/2以上。

3.上水時要雙手操作,一手先開啟水門,隨之另一手開啟注水器汽門,水自然進入爐內停止時,應先關閉汽門,然后關水門,在開關汽門時,臉部躲開正面,以免汽水沖出造成事故 4.鍋爐在運行中,要注意檢查各部,觀察壓力和水位。

如超壓或缺水時,停爐,將灰扒到前邊,稍稍注入冷水,但不準大量注入冷水,以免發(fā)生事故 5.鍋爐在運行中,司爐工不準擅自離開崗位,夜班工作時,不準打瞌睡,更不準睡覺,以免發(fā)生事故 6.鍋爐排污,每班進行一次,在排污前適當調整水位,稍微高2/3,然后進行排污。

7.水位表每班沖洗一次沖洗時,要按規(guī)定程序,先關閉水閥,打開排污閥,沖洗汽閥,這時注意汽的來路是否堵塞然后關閉汽閥,這時注意水的來路是否堵塞沖洗水閥時,有水變汽為止,時間稍長些,才能不出假水位。

8.鍋爐用煤要檢查,煤中有雷管火藥等爆炸物品投入爐內,以防爆炸危險 9.運行中要經常檢查機械設備和電動機外殼溫度,如機械有故障或電動機發(fā)熱超過60度,立即停機檢修 10.鍋爐正常運行時,汽壓不得超過規(guī)定工作壓力,閥每周檢驗一次。

中譯英: 1 Work wear prescribed by the labor supplies, and carefully check the boiler, drainage, gas pipeline accessories, safety valve, pressure gauge, water level meter is a sensitive so to confirm the safety, we can work.

2 Boiler water level the highest level of not more than 2/3, the lowest level of not less than 1/3, in general, maintained above 1/2.

3 Sheung Shui to operate with two hands, one hand to open the gate, then the other hand open water valve, water enters the furnace. Stop, first close the valve, then close the Watergate, the switch valve, the face must avoid the positive, so as not to pop out accident.

4 Boiler in operation, pay attention to the inspection department, observing the pressure and water level. Such as super pressure or water, must stop furnace, grey chop to the front, slightly into the cold water, but not poured into cold water, to avoid accidents.

5 Boiler in operation, fireman to leave post, night work, not to doze off, but are not allowed to go to sleep, to avoid accidents.

6 Boiler blowdown, every class must have a, in sewage before proper adjustment of water level, slightly high 2/3, and then discharge.

7 Water level gauge in each class must be rinsed again. The flushing time, according to the provisions of procedure, to close the valve, open the drain valve, flushing valve, then pay attention to steam route is blocked. And then close the valve, then pay attention to the water source is blocked. Flushing water valve, water changes into steam, slightly longer, to ensure that no false water level.

8 Coal used by the boiler must check, prevent coal powder explosive detonator into the furnace, in order to prevent the risk of explosion.

9 Operation should always check the mechanical equipment and motor shell temperature, such as mechanical failure or motor fever over 60 degrees, immediately stop machine overhaul.

10 The normal operation of the boiler, the steam pressure shall not exceed the stipulated working pressure, safety valve inspection once a week.

(圖/文http://www.jnjrl.com/)

河南太康鍋爐有限公司堅持”誠信為本、質量至上“理念,行業(yè)健康發(fā)展。本著合作互惠互利的發(fā)展理念,愿與新老朋友們一起,共同奔向美好未來!咨詢熱線:16649875575